skip to main |
skip to sidebar
After making fine progress on sleeve #2 of the High Neck Cable and of the last diamond patch mitten this week, I thought I'd move poor, neglected Stevie along. I thought that finishing the back was absolutely within the realm of possibility this afternoon. So, I picked it up, worked a few rows and decided I just wanted to check the armhole and overall measurement:

A mere 20 minutes later, in the hands of this fickle knitter, the nearly complete back of poor Stevie was reduced to this:
I just didn't love it. The fact that over a week would go by without me wanting to knit it should have told me something. Don't get me wrong, I love the yarn...heck, I love the pattern. I just didn't love the two of them together. So, out it came...life's too short to knit things you just don't love, right?
I feel better now, a little sad, but better - like a weight has been lifted from my shoulders. I'll just focus all of my energies (like I should have all along...drat those knitting muses striking me down again after breaking my own "one project at a time" mantra) on cranking out the High Neck Cable and - finally - the last mitten. I'm actually getting the needlepoint bug again - perhaps I'll do a canvas during my early a.m. time for a change of pace??? But, all of my lovely sock yarn is still calling my name!
A complete 180 degree turn-around from how things are going and how I feel about the world...it's all good. As I'm rather anxious to get back to my weekend of knitting, cuddling, and watching football, just a shortie update on the knitting progress.The High Neck Cable sweater is chugging right along. The body (knit in the round) up to the armholes and one sleeve awaiting joining to said body are complete:
I'm really looking forward to wearing this as it is going to go very well with just about everything in my fall/winter wardrobe!
I've also completed one of the diamond patch mittens and gotten over 1/2 done with the second. No photos yet...best to wait 'til they are both done for maximum impact! The first one, though, is pretty neat to look at and it won't be long until I'll need to wear them.After a taking a bit of a pause, I've picked up the new sweater project today: Stevie from Rowan's Cork collection, knit in their new and ultimately snuggly yarn, Coccoon:
This is the project I finally settled on after my brief, but albeit unsuccessful attempt at copying the Audrey cable sweater from Athleta a few weeks back! Knit on size 10.5 needles, this is going so quickly! And I thought knitting the High Neck Cable on size 7 needles was speedy...but then again, my mittens are done on size 0!Ok...I'm done...back to my chair, and football, and knitting!